Fusco  
The Australian Institute of Building Member
Housing Industry Association Gold Member
Master Builders South Australia Member
Home
About
Commercial Projects
Residential Projects
Civil Projects
Tenders
Positions Available
Properties for sale
Contact
commercial projects

Naracoorte Regional Livestock Exchange
Design and construction of the Naracoorte Regional Livestock Exchange Upgrade. This project involved working with the stakeholders of the facility to design an upgrade that improved cattle movements, occupational health and Safety for workers and visitors, cattle welfare and improved the accuracy of scanning and weighing. construction included a new RFID reading system, weighbridge, office building, walkways, pneumatic gates and fencing. Demolition of the existing structures was also undertaken.

Port Lincoln Viterra Grain Silos
Demolition of an existing concrete in ground weighbridge and construction of a new 40m semi pit weighbridge and concrete approach roads. Work was undertaken in confined areas next to existing infrastructure.

Yamba SA
Construction of a 40m in ground weighbridge for the Department of Transport, including concrete trench drains, concrete approach and bypass roads.

Gladstone SA
Work carried out in Gladstone SA at for Viterra. Relocation of a weighbridge operators building, demolition of an existing concrete pit weighbridge and construction of a new above ground weighbridge. Construction of new concrete and spray sealed approach roads and installation of infrastructure for remote driver control stations.

Perilya Port Pirie
Work Carried out at Berth 6 Port Pirie. Works included the construction of a wheel washer, bund walls to an existing warehouse, structural footing systems for a loading facility and various concrete footings for new buildings.

Due to a tight schedule work were undertaken during christmas and new years.

Bowmans SA
Construction of a 28m weighbridge and associated approach roads, structural footings for new grain silos & associated conveyor systems and other various concrete works.

Karratha WA
Project Management of the civil works for a 20m weighbridge, approach ramps and automated driver control station.

Kwinana Beach, WA
Removal of an existing concrete floor and piers for an old fertiliser batching system. Diversion of existing services and excavation of a 9m x 40m pit. Construction of piers for a new batching system and concrete and associated works for 2 x 40m weigh bridges.
Work was carried out for United Farmers (Ravensdown) on a tight time frame, inside an existing functioning fertiliser store

Honeymoon Uranium Mine Site, SA
Civil works for the construction of compounds for transformers and switch rooms. Fusco Constructions was contacted to complete works required urgently. Mobilisation and commencement of the project occurred within 10 days of initial contact. The job was required to be complete on a tight time line in a remote location, subject to dust storms, extreme heat and other weather events.

Cooljarloo Mine Site WA
Construction of a concrete loading structure including washdown area with bobcat access and weigbridge. Work carried out at the Ti West Mine site at Cooljarloo.

Lonsdale & Regency Park, SA
Work carried out for the Government of SA (Department of Transport, Energy & Infrastructure) at Lonsdale and Regency Park. Cut and removed concrete pits and vehicle shaker plates. Constructed concrete pits and provision of services for new shaker plates and brake rollers. Works were undertaken to meet a tight timeframe, during a scheduled shut down.

Blackwood, SA
Connection of power, water and sewer for site amenities, preparation of storage and parking area for John Holland Rail heavy equipment for the Belair rail line upgrade. A vacant site was transformed to accomodate site offices, first aid rooms, toilets and meeting rooms and a parking/storage area. Work included stripping of the top soil and compaction of the existing site. Addtional quarry rubble was introducted and compacted in layers to form an adequate base for heavy equipmeny movement and storage. Power, water and sewer was connected to temporary site huts, a covered walk area was built, including the construction of stairs, security lighting and fencing.

Rockhampton, Queensland
Construction of a 28m weighbridge, approach and exit ramps. Work was undertaken on reclaimed land, a specialised heavy duty foundation was constructed. High strength, high cement content concrete was used due to the high corrosive environment. The project team overcame flash flooding to deliver the project on time and budget.

Ellenbrook, WA
28m weighbridge and footings for site office at Rocla Quarry products Ellenbrook mine site. Construction included the removal of a existing bitumen driveway.

Fremantle WA
Construction of an in-ground weighbridge in the Port of Fremantle which included retaining walls, approach roads and site drainage.

Millicent SA
Repair of an old concrete deck showing severe fatigue cracking. The work was carried out during a 72 hour shutdown period. Utilised heavy equipment and specialised concrete.

Gladstone SA
Construction of a concrete drain to divert a natural creek under a new road. Other works at this site included compaction and build up of sub base and base materials to form new approach roads, construction of a weighbridge and an associated office.

Port Augusta SA
Site preparation that included bulk earthworks, readying the site to receive bitumen pavement and removal and replacement of the existing roadways and underground services. Project was undertaken for the Department of Transport, Energy and Infrastructure.

Fusco Group Pty. Ltd. - 103 Sheoak Road, Belair, South Australia 5052 - Phone: +618 08 7221 2663 - Fax: +61 08 8370 2580 - info@fusco.com.au - ABN: 19 132 033 884

Copyright Fusco. 2008 All Rights Reserved     Legal Policy Hosted by Webzone Internet